Realised projects

2011

In 2011 we financed 30% of the building costs for the Secondary School in Andaung Chenh while the balance was financed from 2 German foundations. The building activities were finished in time to start the schooling for the new school year 2010/2011 end of oktober 2011. Now the scholars can start their primary education and can follow up with their secondary school on the same place.

Tineke van den Beek as the Don Bosco building coordinator wrote us the following:

Dear benefactors,
The construction workers, some are siblings of our students, did an incredible job from beginning to end. Don Bosco Andaung Chenh secondary school looks magnificent! Please see attached file. The remainder: only little jobs and painting parts of in and outside walls and pillars with sand colour Spectro paint. Completion, October 2011. Thanks to Dutch benefactors, Stichting Scholenproject Cambodja Rotterdam, we can start to furnish classrooms with professional single desks and black boards.
Attached you find the completion report and accounting summary . We are very grateful for your generosity towards Cambodian youth. Your support is helping them to break out of poverty, illiteracy and ignorance and receive hope...

Best regards from all of us.
Sincerely yours,
Tineke

2010

In the beginning of 2010 we started a fundraising campaign for the reconstruction of the Technical School of Don Bosco after the earthquake which hit Haiti.

Furthermore we were able to finance the building material for a new school building with 6 class rooms in Chenh Cheang (provincie Takeo) together with the foundation De Brug and their Cambodian sister foundation Spie-en. This project was co-financed by NCDO.
Building report »»»

2009

12 class rooms for the Don Bosco literacy center in Andaung Chenh, Battambang

Newsletter Don Bosco Literacy center »»

Since 1999 the Don Bosco Foundation of Cambodia in Battambang operates two literacy centers. Initially these centers offered during a four years training the basic of education to the youth who has never before attanded any school nor followed any education. Until than the children had no other choice than work together with their parents in the nearby stone factories to earn some money for the family needs. They were paid not more than 0,50 US$ a day!


Construction of school in Andaung Chenh.

When Don Bosco started these two centers they begin to talk and convince the factory owners and the families of the children that there had to be done something about the childrens education for the best of their own and the countries future. A first step was that the children were allowed to attent school for some hours a day after their work; later they were allowed to work for half a day and go to school the afternoon and finally a stage was reached that the children could attend a complete four years course after which they could attent and fit into a normal school. Todays situation is even progressed further so that the children do not have to work anymore but are able to start directly with a normal school without attending a literacy center any more. Therefore Don Bosco was asked by the local government to change the literacy center into a basic school for the future and Don Bosco has asked our foundation for the funding of this new school with 12 class rooms. The old buildings will be used in the future for a kitchen and a store room for agricultural machines which are necessary for the future practical lessons in agriculture which will be part of the new school system as well.

In Holland we have been able to sign a co-finance agreement with IMPULSIS (a joint venture of Church in action, ICCO and EDUKANS) which means that IMPULSIS will double all donations which SSCR is able to receive. The total budget comes to 81.756 US $ or 56.383 Euro half of which we have to raise funds for ourself and the other half will than be doubled by IMPULSIS.

2008

In Holland our foundation worked on the fundraising for a new Primary School for Andaung Chenh of 10 class rooms + library + teacher room. In Cambodja the CMAC did clear the building site of old mines of which they found and destroyed 8 explosives successfully.


(left) Clearing of mines (right) Explosives

2007

6 classroom school in Onlong Kropae
Via the Don Bosco Foundation of Cambodia SSCR received the request to finance the building of a new 6 classroom school in Onlong Kropae. The teachers, school committee and local community as well as ministry of education have all approved the construction and will provide the ground for free. SSCR adopted this plan and now tries to finance this new school and two toilets in the small village of Onlong Kropae, 85 km outside of Sihanoukville. Here are 74 families living with in total 380 people. 200 children are going to school today in a wooden 2 classroom building in 3 different sessions and receive lessons by 3 young teachers.

We want to add toilets to the school and extend the school by this new 6 class building so that the classes can be smaller and the lessons can be given in two sessions by more teachers. On top of it can the teachers in future live in the former old wooden building instead of one small bamboo hut where they are living together today.

The Don Bosco Foundation of Cambodia will be supervising the construction which will be done by the local villagers themselves together with a professional building company.

All donations will be doubled by the co-finance organisation NCDO

The builders had quite some difficulties in bringing the building material and equipment and their workmen to the deserted village due to heavy rainfall and a sandy road in a very bad condition which was nearly completely destroyed by the rainpoor. But finally the school was in time ready for the new schoolyear 207/2008 and teachers and students welcomed the new and especially dry building very, very much.

The local authorities did not only provided the land free of charge and will pay the salaries of the three teachers but also provided for the first time the school furniture as well. A welcomed step in the direction of acceptance of their own local responsibility for the education in their district! As a sideeffect we had some extra financial means left to extend the project by a toilet group and 2 sportfields: one foot- and one volleybalfield. This extra parts of the project were completed in februari 2008 and with it the school project Onlong Kropae has been completed and can be accounted for towards the Dutch co-finance organisation NCDO.

Perhaps the most important effect of our project was not only to have a good and dry schoolbuilding but it seems that the local authorities have noticed the problem of this remote village and have in the meantime repaired the access road to the main road so that the village is accessible during the rain season as well. Furthermore has another NGO showed their interest in this region and started to build a small health centre and a Thai company decided to invest into a sugar factory so that there will be more work places created. In that way has our small school project brought a lot of subsequent other projects on the map and the village has a possibility to prosper in the near future.

With these positive resultats in mind we are very eager to start up our next 2008 project of 12 new class rooms on the Don Bosco literacy center in Andaung Chenh, Battambang. (see further under "planned projects")

2006 Thanks to www.adventure4school.nl and cofinancing of Plan Netherland we could realize the 51st school in April 2006 for the Aphiwat Primary School in Chanking Point, in the village Palilai, Commune Poipet in the district Banteay Mean Chey.

In August 2006 the 2nd building for the Aphiwat Primary School was ready (52nd school). (subsidized by Edukans)

   
2005 4 new schools (29th up to 32nd) via Spie-en/De Brug in Sdaov Leu and Kang Tanoeng both in Kang Maes district, province Kompong Cham and in Trapeang Krock and Ang Taphook, Bati district in Takeo province. (subsidized by NCDO)

Repair of 2 schools (48th and 49th) via Spie-en/De Brug in Mean, district Orengov and in Prasath, Chhouk district both in Kompong Cham province.(subsidized by NCDO)

New primary school (50th) with 6 classrooms in "Palilai II" in the vicinity of Poipet under supervision of Don Bosco Foundation of Cambodia.( subsidized by NCDO)

School- and sewing material for 2 schools of HSPCC (subsidized by NCDO)
Sending second hand material: 158 monitors, 17 computers, 2 laserprinters for the Technical School of Don Bosco Foundation of Cambodia at Sihanoukville

   
2004 Construction of school kitchen in Don Bosco Poipet project for streetchildren
  Construction 24th and 25th school, incl. furniture, school material, playground, WC and well in Ta Maov (Kampong Cham provincie) and Ta Kim (provincie Takeo) via Spie-en / De Brug
  Financing of office-, school- and sewing materials for the 2 HSPCC schools in Siem Reap
  Consruction 26th and 27th school incl. furniture, school material, playground, WC and well in Svay Tanong and Tropeang Koong and repair 28th school incl. furniture in Pring Dei Daem via Spie-en / Stichting De Brug
  Financing 4 new schools (29th - 32nd) incl. school material, playground, WC and well via Spie-en / Stichting De Brug
  Repair of 10 district schools (33rd - 42nd ) in Poipet via Don Bosco Foundation of Cambodia
  Construction of 5 pre-schools (43rd - 47th ) in communities Nearay and Taten in d province Kampot via CADFP
  Financing of 284 bicycles for children and students via Don Bosco Children Fund of Cambodia
  Support of 198 children and 1 student via Don Bosco Children Fund of Cambodia
   
2003

Construction 16th and 17th school, primary education, at Prahout village and Cheuteal Chrum village, Takeo province, under responsability of Spean / Foundation The Bridge

Construction 3 nursery schools (18th, 19th and 20th) at Touch, Morn and Bramoul via CADFP

Construction 21st school, primary school in Siem Reap province for Helper students for the poor students.

Completion 22nd school by Spean / Foundation The Bridge in Takeo province

Construction 23rd school in Smak Daem, Sihanoukville province, by Don Bosco Foundation of Cambodia

Construction of 5 playgrounds for the before mentioned schools

   
2002

Construction of 11th school in Poipet, Battambang, under responsability of the Don Bosco Foundation of Cambodia.

Construction of 12th and 13th kindergarten in the villages of Trapang Loenk and Angklang, Kampot province, under responsability of Cambodian Association for Development of Farmers and the Poor (CADFP).

Construction 14th school in Prahout, Takeo district, under responsability of Spean / Foundation The Bridge.

Construction 15th school in Sen Sok Village in the vicinity of Phnom Penh by the Don Bosco Foundation of Cambodia

   
  opening new school Opening ceremony of a new school. Front row 2nd from left is Father John Visser of Don Bosco foundation of Cambodia.
   
2001

Construction of a 7th school with 6 classes in Srock Chheung Prey village, Kampong Cham province under the responsability of the Don Bosco Foundation of Cambodia

Construction of 8th school with 5 classes in Sramor, Prey Vang under the responsability of  Spean / Foundation The Bridge

Completing the construction of a 9th and 10th school in Ang Chum and Bothum Sorya, Takeo province under the responsability of Spean / Foundation The Bridge

Emergency aid after flooding

Support for AIDS education and prevention projects

   
2000 
 
Completion of 4,5 km road repair. Realisation of 2km water-pipeline between the villages of Don Daum and Ngong as well as 1,5km further to Beungchroy. 

Investing in pumps and a generator for the wells, electrical appliances for the policlinic inclusive refrigerator, vans and lighting. 

Support to 240 children, 34 teachers and 4 members of the policlinic.

   
1999 Starting the repaires on a road destroyed by floods
  Policlinic "Zuster A. Heeman" opened in December
  Medical personnel trained and policlinic furnished
  Sewing school & community centre "Charlois" opened in October
   
1998 12.400 m2 land bought for policlinic, sewing school & community centre
  Construction of three fishing ponds with connecting canal
  Construction of two water towers for the storage of drinking water
  Started building the policlinic
  Started building sewing school & community centre (6th)
   
1997 Primary school "Zuidwijk" built (5th), furnished and opened
  Bought a second-hand terrain vehicle for assistance with (building)projects
   
1996 Primary school "Hoekse Waard" built (4th), furnished and opened
  Construction of a toilet unit with sewer connection
  Construction of four buildings for widows
   
1995 Primary school "Pendrecht" built (3rd), furnished and opened
  Drilling of four water wells
  Renovation and opening of two existing primary schools (1st and 2nd)

Sowing school and community centre